• Wellington Hospital, this included foundations, slab prep and asphalt prep
  • Government House, this included the tunnel dig under the house and side service trench tunnels using a 1.5t digger and a bobcat.  Machines were equipped with cadillac convertors for the safety of staff within the tunnels.  I was a foreman on this site and ensured that the site was conducted in a safe and secure manner as required by the main contractor who was appointed by Government.
  • Wellington train upgrade, this work included completing the new platform upgrades for the new trains.  This work was completed on a tight schedule as to keep disruption to the network to a minimum.
  • War Memorial Park Alliance, this work included major trench and service relocations allowing for the new temporary road and footpaths.  We were contracted by the alliance to be on call for all required works, sometimes at short notice and after hours/weekend work.  The work on this site is varied but includes large truck hire, digger hire and operators as well as labourers.
  • Ultra-Fast Broadband, this work was situated in the Wellington CBD which has numerous unknown services which makes trenching a difficult task.  Ultra-Fast Broadband work includes trenching, duct laying, pulling cable, installing of chamber pits and reinstatement of asphalt/concrete.
  • Private house sites, this work is varied but includes driveways, demolition, drainage, storm debris removal and landslip clean up and small amounts of landscaping.